Bombay HC: Stop blaming BMC for water-logging, it's our own creation
National
Share
AI REPORT
2 min read

Bombay HC: Stop blaming BMC for water-logging, it's our own creation

BN

Curated By

BatchNode Editorial Desk

A hearing on a plea by the Mumbai civic body turned into a blunt assessment of the civic sense of citizens on Tuesday, with the Bombay High Court flagging the people’s ‘uncanny knack’ for land grab and dumping of waste in drains, which it said causes water-logging in monsoon. Citizens should stop blaming the Brihanmumbai Municipal Corporation (BMC) alone for monsoon water-logging, a bench of acting Chief Justice Ravindra Ghuge and Justice Gautam Ankhad said, noting that encroachments and clogged drains are ‘our own creation’ and flooding is obvious during monsoon. ‘We have an uncanny knack for grabbing lands. We put all the dirt and material inside, and we block the gutters.

One small spell of rain blocks the roads in Mumbai. It’s our own creation,’ the bench said. The bench was hearing a plea filed by the BMC seeking a direction to the Department of Atomic Energy (DAE) to remove encroachments from its land required for a road-widening project on the Sion-Trombay road.

Senior advocate Milind Sathe, representing the BMC, stated that the civic body had cleared encroachments for the existing 30-foot-wide road, for which nearly 192 trees were also felled. He, however, said that the remaining land required to widen the road to 50 feet was with DAE, which oversees the Bhabha Atomic Research Centre (BARC), situated in the vicinity of the road concerned. Sathe added that if BARC wanted a 50-foot-wide road, the civic body was ready to make it; however, it should provide encroachment-free land between 30 and 50 feet.

Experimental Hub

Welcome to thehmars.
This is an experimental, automated portal. Just a heads up:

  • Raw Feeds: Content is scraped and posted by scripts, so there's no manual editing or fact-checking.
  • Desktop First: The website is optimized for desktop only. Mobile and tablet devices may experience layout issues or unexpected behavior.
  • Work in Progress: The donation and newsletter systems have been temporarily paused while we upgrade our internal systems.

Spot a bug, want to contribute, or interested in getting a portal setup like this built for yourself? I'd love to chat—reach out via the contact form!